Draco 1

Degan’s System – Draco I – The entire digester and retaining walls plastered with b-bond, a fiberglass reinforced plaster said to be used on dry-stacked block in coal mines to keep methane out. I believe this plastering was done with care, but there was even a bit of water leakage – which stopped as sludge filled the small cracks on the inside.

Leave a Reply